Descripción
|
|
---|---|
When the Metro in Lisbon contracted to Invesys Dimetronic the new Control Centre and headway regulation system for the Red Line, they asked the company to solve to issues: -How to Test the system, without interfering with the operation of the line. -How to Train the staff in the new system before it was put in service | |
Internacional
|
Si |
Nombre congreso
|
1ST WORLD CONGRESS ON RAIL TRAINING |
Tipo de participación
|
960 |
Lugar del congreso
|
Madrid, Spain |
Revisores
|
Si |
ISBN o ISSN
|
|
DOI
|
|
Fecha inicio congreso
|
12/04/2011 |
Fecha fin congreso
|
15/04/2011 |
Desde la página
|
1 |
Hasta la página
|
8 |
Título de las actas
|
1ST WORLD CONGRESS ON RAIL TRAINING |