Observatorio de I+D+i UPM

Memorias de investigación
Book chapters:
A MILP Event Based Formulation for a Real-world Multimode RCSP with Generalized Temporal Constraints
Year:2014
Research Areas
  • Operative research and mathematic programming,
  • Engineering
Information
Abstract
Scheduling is becoming much more important in every industry. However, the standard RCSP usually does not cover all the characteristics of real world problems. In this work, we present an Event Based MILP formulation for a Multimode Resource Constraint Scheduling Problem of direct application for some industries, as aeronautical assembly lines. Taking as a starting point one of the last MILP formulations for standard RCSP, our contribution is to provide a formulation which covers the multimode case and more general temporal constraints than the ones usually referred to in the literature.
International
Si
10.1007/978-3-319-04705-8_13
Book Edition
1
Book Publishing
Springer International Publishing
ISBN
978-3-319-04704-1
Series
Lecture Notes in Management and Industrial Engineering
Book title
Managing Complexity
From page
113
To page
120
Participants
  • Autor: Tamara Borreguero Sanchidrian (AIRBUS / UPM)
  • Autor: Alvaro Garcia Sanchez (UPM)
  • Autor: Miguel Angel Ortega Mier (UPM)
Research Group, Departaments and Institutes related
  • Creador: Grupo de Investigación: Ingeniería de Organización y Logística
  • Departamento: Ingeniería de Organización, Administración de Empresas y Estadística
S2i 2019 Observatorio de investigación @ UPM con la colaboración del Consejo Social UPM
Cofinanciación del MINECO en el marco del Programa INNCIDE 2011 (OTR-2011-0236)
Cofinanciación del MINECO en el marco del Programa INNPACTO (IPT-020000-2010-22)