Descripción
|
|
---|---|
This paper studies the impact that different approaches of modeling the real-time use of the secondary regulation reserves have in the joint energy and reserve hourly scheduling of a price-taker pumped-storage hydropower plant. The unexpected imbalance costs due to the error between the forecasted real-time use of the reserves and the actual value are also studied and evaluated for the different approaches. The proposed methodology is applied to a daily-cycle and closed-loop pumped-storage hydropower plant. Preliminary results show that the deviations in the water volume at the end of the day are important when the percentage of the real-time use of reserves is unknown in advance, and also that the total income in all approaches after correcting these deviations is significantly lower than the maximum theoretical income. | |
Internacional
|
Si |
Nombre congreso
|
5th International Workshop on Hydro Scheduling in Competitive Electricity Markets |
Tipo de participación
|
960 |
Lugar del congreso
|
Trondheim, Norway |
Revisores
|
Si |
ISBN o ISSN
|
1876-6102 |
DOI
|
|
Fecha inicio congreso
|
17/09/2015 |
Fecha fin congreso
|
18/09/2015 |
Desde la página
|
53 |
Hasta la página
|
60 |
Título de las actas
|
Modeling the Real-Time Use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant |