Descripción
|
|
---|---|
This paper studies the impact that different approaches of modeling the real-time use of the secondary regulation reserves have in the joint energy and reserve hourly scheduling of a price-taker pumped-storage hydropower plant. The unexpected imbalance costs due to the error between the forecasted real-time use of the reserves and the actual value are also studied and evaluated for the different approaches. The proposed methodology is applied to a daily-cycle and closed-loop pumped-storage hydropower plant. Preliminary results show that the deviations in the water volume at the end of the day are important when the percentage of the real-time use of reserves is unknown in advance, and also that the total income in all approaches after correcting these deviations is significantly lower than the maximum theoretical income. | |
Internacional
|
Si |
JCR del ISI
|
No |
Título de la revista
|
Energy Procedia |
ISSN
|
1876-6102 |
Factor de impacto JCR
|
|
Información de impacto
|
|
Volumen
|
|
DOI
|
|
Número de revista
|
|
Desde la página
|
53 |
Hasta la página
|
60 |
Mes
|
SIN MES |
Ranking
|