Descripción
|
|
---|---|
This paper presents a method for determining and controlling variables which are critical to the desired duration of a project. The proposed method consists of four stages: 1) a Monte Carlo simulation of project scheduling using a dependency structure matrix (DSM), 2) the reduction of the number of input variables using an index based on the standardized regression coef?icient, 3) the determination and regionalization of critical variables using a modi?ied Monte Carlo Filtering (mMCF) method, and 4) an evaluation of risk of the project duration under the regionalized conditions. The proposed method was applied to three case studies. Results show that the method could be helpful in scheduling projects to obtain the desired duration under uncertainty, identifying critical variables, and regionalizing the critical input variables. | |
Internacional
|
Si |
JCR del ISI
|
No |
Título de la revista
|
Journal of Modern Project Management |
ISSN
|
23173963 |
Factor de impacto JCR
|
0,32 |
Información de impacto
|
|
Volumen
|
5 |
DOI
|
10.19255/JMPM01305 |
Número de revista
|
1 |
Desde la página
|
46 |
Hasta la página
|
60 |
Mes
|
MAYO |
Ranking
|
SJR = 0.32 => Q2 http://www.scimagojr.com/journalsearch.php?q=21100432037&tip=sid&clean=0 |