Descripción
|
|
---|---|
The observability of the state of a power system given a set of redundant measurements is a relevant problem as it is a necessary step prior to state estimation, as well as an accurate estimate of the state is crucial to achieve a secure operation. In this paper, this problem is addressed through a novel approach: the solution of a well-behaved integer linear programming problem. Several realistic case studies including up to 2383 buses (Polish system) illustrate the computational efficiency of the method proposed. The obtained results are analyzed from a statistical perspective and compared with a traditional approach using the design of experiments and analysis of variance (ANOVA) methodologies. | |
Internacional
|
Si |
JCR del ISI
|
Si |
Título de la revista
|
Electric Power Systems Research |
ISSN
|
0378-7796 |
Factor de impacto JCR
|
|
Información de impacto
|
|
Volumen
|
|
DOI
|
|
Número de revista
|
|
Desde la página
|
207 |
Hasta la página
|
215 |
Mes
|
NOVIEMBRE |
Ranking
|