Contribution to Load-Frequency Regulation of a Hydropower Plant with Long Tail-Race Tunnel
Año:2015

Áreas de investigación
  • Integración de fuentes de energías renovables,
  • Ingenieria civil

Datos
Descripción
In this paper, a hydroelectric power plant with long tail-race tunnel has been modelled for assessing its contribution to secondary regulation reserve. Cavitation problems, caused by the discharge conduit length, are expected downstream the turbine where low pressure appears during regulation manoeuvres. Therefore, governor?s gains should be selected taking into account these phenomena. On the other hand, regulation services bidden by the plant operator should fulfil TSO (Transmission System Operator) quality requirements. A methodology for tuning governor PI gains is proposed and applied to a Hydro power plant in pre-design phase in northwest area of Spain. The PI gains adjustment proposed provides a proper plant response, according to some established indexes, while avoiding cavitation phenomena.
Internacional
Si
Nombre congreso
2015 IEEE 15th International Conference on Environment and Electrical Engineering
Tipo de participación
960
Lugar del congreso
Roma, Italia
Revisores
Si
ISBN o ISSN
978-1-4799-7992-9
DOI
Fecha inicio congreso
10/06/2015
Fecha fin congreso
13/06/2015
Desde la página
1886
Hasta la página
1891
Título de las actas
2015 IEEE 15th International Conference on Environment and Electrical Engineering

Esta actividad pertenece a memorias de investigación

Participantes

Grupos de investigación, Departamentos, Centros e Institutos de I+D+i relacionados
  • Creador: Grupo de Investigación: Hidroinformática y Gestión del Agua
  • Grupo de Investigación: Generación eléctrica con energía eólica
  • Departamento: Ingeniería Civil: Hidráulica, Energía y Medio Ambiente