Descripción
|
|
---|---|
ENGINEERING, MULTIDISCIPLINARY: año 2015, factor de impacto 0.302, cuartil Q4, clasificación 77/85This paper studies the possibility of using the following occupational risk assessment methods for construction works: INSHT, ANACT, THREP, SHERPA, RNUR, EVENT TREE, LEST, FINE, ERGONOMIC ANALYSIS and PSYCHOSOCIAL FACTORS. Of these methods, INSHT, ANACT, RNUR and FINE have been selected with the objective of applying them to real building works, in order to determine the discrepancies in the results obtained compared to the risks analyzed. The results make it possible to ascertain the types of risk which each method most reliably detects, there being methods which are not able to detect extreme or very low risks. It is concluded that if a single risk assessment method is used, the results do not entirely reflect reality, as such it is necessary to establish a new risk assessment methodology for construction works. | |
Internacional
|
Si |
JCR del ISI
|
Si |
Título de la revista
|
Revista de la Construccion |
ISSN
|
0718-915X |
Factor de impacto JCR
|
0,185 |
Información de impacto
|
Datos JCR del año 2015 |
Volumen
|
16 |
DOI
|
10.7764/RDLC.16.1.104 |
Número de revista
|
1 |
Desde la página
|
104 |
Hasta la página
|
114 |
Mes
|
SIN MES |
Ranking
|
clasificación 59/61 |