Abstract
|
|
---|---|
This paper describes a 360 kWp PV water pumping system to an elevated water pool in a borehole named San Cristóbal of the Irrigator?s Community of Alto Vinalopó, Villena, Spain. This system is able to work along the year, being the maximum need to satisfy in July. The goal of this paper is to show the design, the implementation of the system and some first results by analysing the monitoring done since 1st of June until the end of August. During this period, 173780 m3 of water were pumped and it was working more than 800 hours thanks to its north-south horizontal axis tracker. | |