Descripción
|
|
---|---|
Despite the availability of design codes, it has to be emphasized that security cannot be totally assured; even if guidelines proposed in design codes are strictly followed. Therefore, from the midst of 90s, many construction industry experts began to propose the integration of Risk Management (RM) methodologies to construction development processes. In many countries, the society evolved to consider the philosophy of prevention as the base for its national standards and regulations. The recent studies indicate that, according to European statistics, about 80-85 per cent of all building failures and damages are related to problems in the ground. It means that until now, ground-related problems remain the biggest cause of delays and cost overruns in civil engineering projects, suggesting that engineers still need a better understanding of the nature of geotechnical risk. Before analyzing the geotechnical risk, the engineer needs to understand and define the geotechnical risk scenarios for each project in particular that he or she has to face. This was the basic reason for the development of a concise and consistent methodology for systematical identification of risks related to geotechnical problems of building construction projects. | |
Internacional
|
Si |
Nombre congreso
|
1st Latin American Congress on Project Engineering |
Tipo de participación
|
960 |
Lugar del congreso
|
ANTOFAGASTA, CHILE |
Revisores
|
Si |
ISBN o ISSN
|
2027-7040 |
DOI
|
|
Fecha inicio congreso
|
30/06/2010 |
Fecha fin congreso
|
02/07/2010 |
Desde la página
|
241 |
Hasta la página
|
249 |
Título de las actas
|
Proceedings of the I. Latin American Congress on Project Engineering |