Descripción
|
|
---|---|
The "Electric House" is considered the most significant work realized by Gruppo 7, as it is the first and only completed project signed by this collective of architects. This work marks the end of the group's activity, although not the end of their individual careers: the topics faced with the Electric House will eventually continue being developed by each of the members of the group. The analysis of this work is part of the PhD thesis research that focuses on the whole professional and personal history of the Gruppo 7, on its design methods and its results | |
Internacional
|
Si |
JCR del ISI
|
No |
Título de la revista
|
T+A - Time + Architecture (ShiDai JianZhu) |
ISSN
|
1005-684X |
Factor de impacto JCR
|
|
Información de impacto
|
|
Volumen
|
|
DOI
|
|
Número de revista
|
156 |
Desde la página
|
156 |
Hasta la página
|
163 |
Mes
|
JULIO |
Ranking
|