Abstract
|
|
---|---|
This paper presents an assessment and evaluation of the costs of operation and maintenance (O&M) in a real PV rural electrification (PVRE) programme, with the aim of characterizing its costs structure. Based on the extracted data of the 5-years operational costs of a private operator, the programme has been analyzed to take out the most relevant costs involved in the O&M phase as well as the comparative appraisal between the 3 main activities: installation, O&M and management. Through this study we try to answer to the new challenge of decentralized rural electrification based on larger programmes (with tens of thousands of SHSs) and longer maintenance and operation periods (at least 10 years). | |
International
|
Si |
JCR
|
Si |
Title
|
Renewable and Sustainable Energy Reviews 20 |
ISBN
|
1364-0321 |
Impact factor JCR
|
|
Impact info
|
|
Volume
|
20 |
|
|
Journal number
|
|
From page
|
1 |
To page
|
7 |
Month
|
SIN MES |
Ranking
|