Abstract
|
|
---|---|
Nowadays, any telecommunications company that owns its own network must face the problem of maintaining it (service assurance). Provide a minimum quality of service to its customers must be one of its main objectives. This quality should be maintained although any incidents happen to occur in the network. This thesis aims to solve the problem of prioritizing the order in which the damaged cables, trails, path and circuits, within a backbone transport network, should be restored. This work begins with a detailed explanation about network maintenance issues and all the factors that influence decision-making problem. First of all, one solution based on Discrete Multicriteria methods is tried (ELECTRE I and AHP algorithms are used). Also, a solution based on neural networks (with two different approaches to the problem) is analyzed. Finally, this thesis proposes an algorithm based on Particle Swarm Optimization (PSO), adapted to a problem of integers permutation, and a particular way of evaluating the best overall position of the swarm method. In addition, there is included an exhibition about telecommunications companies, its departments, internal processes, services offered to clients, physical networks, and key points to consider when implementing its integrated management systems. DOI:10.20868/UPM.thesis | |
International
|
No |
|
|
Type
|
Doctoral |
Mark Rating
|
Sobresaliente cum laude |
Date
|
01/02/2016 |