Descripción
|
|
---|---|
This is a simulation of the rehabilitation of the deteriorated Salón de Reinos, the building that will become the extension of the Prado Museum, and soon to be carried out by Norman Foster and Carlos Rubio with his project. A 4D planning was undertaken from a 3D architectural model linking it with a classic planning to obtain a 4D BIM. Due to the size of the building, it was divided into two North-West zones (with scaffolding in the courtyard) and South-East (with mobile scaffolding on the sidewalk). With the video, the progress and the needs are checked in a visually very simple way. | |
Internacional
|
Si |
Nombre congreso
|
EUBIM 2017. Congreso internacional BIM/ 6º encuentro de usuarios BIM |
Tipo de participación
|
960 |
Lugar del congreso
|
Valencia España |
Revisores
|
Si |
ISBN o ISSN
|
978-84-9048-623-8 |
DOI
|
|
Fecha inicio congreso
|
19/05/2017 |
Fecha fin congreso
|
20/05/2017 |
Desde la página
|
220 |
Hasta la página
|
227 |
Título de las actas
|
EUBIM 2017. Congreso internacional BIM/ 6º encuentro de usuarios BIM LIBRO DE ACTAS THE BIM BANF |